Distribution and Panels
The provision is made by the general Γ.Π.Χ.Τ. which supplies the general switch of each floor, the PILLAR on the roof for the outdoor air conditioning units and ventilation fans, the panels of the three lifts, the fire extinguisher panel.
There is an APC UPS (Model Silcon 80 kW) with a switchboard for supplying the UPS sockets. There is space in the two basements for installation of 150 kVA electricity generation systems, already aprroved by the Fire Brigade.